TB-9-2320-302-13-P-2

CREW PROTECTION KIT PART 2 OF 3

TECHNICAL BULLETIN; OPERATOR'S, UNIT AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS AND REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2007

  TB-9-2320-302-13-P-2 - Page 100 of 396

TB 9-2320-302-13&P-2
UNDERBODY MINE BLAST PANEL REPLACEMENT - CONTINUED
0017 00
0017 00-12
INSTALLATION - CONTINUED
4.
Push cable (25) through left underbody mine blast panel (26).
5.
Install cable plug mounting plate (24) located on left inside of cab assembly (4) with four ground wires (27), new lock-
washers (23), washers (22), and bolts (21).
440-019
25
26
27
4
21,22,23
24


Back to Top