TB 9-2320-302-13&P-2
UNDERBODY MINE BLAST PANEL REPLACEMENT - CONTINUED
0017 00
0017 00-17/(0017 00-18 Blank)
INSTALLATION - CONTINUED
14.
Install two washers (2) and new locknuts (3) on rear cab mounts (1).
15.
Install air cleaner and intake duct hosing. For the M915A3P1, M916A3P1, and M917A2P1, refer to TM 9-2320-302-20-
2. For the M915A4P1, refer to TM 9-2320-303-24-1. For the M915A2P1, M916A1P1, M916A2P1, and M917A1P1,
refer to TM 9-2320-363-20-2.
16.
Install transmission shift tower. For the M915A3P1, M916A3P1, and M917A2P1, refer to TM 9-2320-302-20-2. For the
M915A4P1, refer to TM 9-2320-303-24-1. For the M915A2P1, M916A1P1, M916A2P1, and M917A1P1, refer to TM
9-2320-363-20-2.
17.
Install right and left seats. For the M915A3P1, M916A3P1, and M917A2P1, refer to TM 9-2320-302-20-2. For the
M915A4P1, refer to TM 9-2320-303-24-1. For the M915A2P1, M916A1P1, M916A2P1, and M917A1P1, refer to TM
9-2320-363-20-2.
END OF WORK PACKAGE
440-014
2
3
2
1
1
2
3