TB-9-2320-302-13-P-3

CREW PROTECTION KIT; AIR CONDITIONING KIT PART 3 OF 3

TECHNICAL BULLETIN; OPERATOR’S, UNIT, AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

MARCH 2008

  TB-9-2320-302-13-P-3 - Page 145 of 240

TB 9-2320-302-13&P-3
A/C HOSE REPLACEMENT - CONTINUED
0020 00
0020 00-9
INSTALLATION - CONTINUED
CAUTION
Cap all A/C hose ends and component connections during installation to protect against contamination. Fail-
ure to comply may cause damage to equipment.
NOTE
Install hoses as tagged at removal.
During installation, route hoses as noted during removal from vehicle.
1.
Install A/C hose (20) and A/C hose (19) route from fittings on left side of evaporator assembly over the top and down
the right side of the evaporator assembly.
2.
Apply refrigerant oil to new O-ring and install A/C hose (20) connection on evaporator assembly (28).
3.
Apply refrigerant oil to new O-ring and install A/C hose (19) connection on evaporator assembly (28).
4.
Install spiral wrap (26) and new tiedown straps (25) on A/C hose (19) and A/C hose (20).
5.
Install three hose clamps (24) and new locknuts (23) (or other hose clamp mounting hardware) on rear wall of vehicle
(27).
449-055
19
20
27
26
25
24
23


Back to Top