TB-9-2320-335-13-P

TRUCK, UTILITY: EXPANDED CAPACITY, IAP/ARMOR READY

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE AND REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL) INSTRUCTIONS

MAY 2008

  TB-9-2320-335-13-P - Page 307 of 680

TB 9-2320-335-13&P
15-11
FOLLOW-ON TASKS: • Install oil pressure sending unit (TM 9-2320-387-24-1).
• Install glow plugs (TM 9-2320-387-24-1).
• Install fuel injection nozzles (TM 9-2320-387-24-2).
• Install fuel injection return hoses (TM 9-2320-387-24-1).
• Install rocker arm shafts and pushrods (TM 9-2320-387-24-2).
• Install water crossover (para. 3-79.1).
• Install left intake manifold (TM 9-2320-387-24-2).
• Install left exhaust manifold (TM 9-2320-387-24-1).
• Install alternator/power steering mounting bracket (TM 9-2320-387-24-1).
TORQUE SEQUENCE
15-4. LEFT CYLINDER HEAD REPAIR (Cont'd)


Back to Top