TB-9-2320-335-13-P

TRUCK, UTILITY: EXPANDED CAPACITY, IAP/ARMOR READY

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE AND REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL) INSTRUCTIONS

MAY 2008

  TB-9-2320-335-13-P - Page 390 of 680

24-8.1. RIGHT AIRLIFT BRACKET AND FRONT UPPER CONTROL ARM BRACKETS
REPLACEMENT (SERIAL NUMBERS 300000 AND ABOVE)
This task covers:
a. Removal
b. Installation
TB 9-2320-335-13&P
24-6
INITIAL SETUP:
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Maintenance and repair shop equipment:
automotive (Appendix B, Item 2)
Materials/Parts
Two lockwashers (Appendix A, Item 144)
Ten locknuts (Appendix A, Item 114.4)
Two locknuts (Appendix A, Item 88)
Two locknuts (Appendix A, Item 106)
Manual References
TM 9-2320-387-24-1
TM 9-2320-387-24-2
TM 9-2320-387-24P
Equipment Condition
• Airlift crossbrace removed
(TM 9-2320-387-24-1).
• Engine right splash shield removed
(para. 10-24.1).
Maintenance Level
Direct support
1.
Raise and support front of vehicle.
2.
Remove two locknuts (9), washers (8), clip (4), two washers (2), and capscrews (1) from
airlift bracket (7) and frame rail (17). Discard locknuts (9).
3.
Remove two locknuts (12), washers (11), capscrews (3), lockwashers (5), and washers (6) from
radiator support (10) and airlift bracket (7). Discard locknuts (12).
4.
Remove two locknuts (24), washers (25), capscrews (18), washers (20), and upper control arm (22)
from two control arm brackets (21). Discard locknuts (24).
NOTE
• Control arm bracket towards front of vehicle contains bolt and
bracket assembly.
• Note direction of capscrews for installation.
5.
Remove six locknuts (26), washers (27) and (13), and capscrews (14) from two control arm brackets
(22), airlift bracket (7), and frame rail (17). Discard locknuts (26).
6.
Remove two locknuts (15), washers (16), bolt and bracket assembly (23), control arm brackets (21),
shim(s) (19), if present, and airlift bracket (7) from frame rail (17). Discard locknuts (15).
NOTE
Control arm bracket towards front of vehicle contains bolt and
bracket assembly.
1.
Install airlift bracket (7), shim(s) (19), if removed, and two control arm brackets (21) on
frame rail (17) with six capscrews (14), washers (13) and (27), and locknuts (26). Tighten
locknuts (26) to 90 lb-ft (122 N
m).
2.
Apply sealing compound to threads of bolt and bracket assembly (23).
3.
Secure airlift bracket (7) and control arm brackets (21) on frame rail (17) with bolt and bracket
assembly (23), two washers (16), and locknuts (15).
4.
Install upper control arm (22) on two control arm brackets (21) with two capscrews (18),
washers (20) and (25), and locknuts (24). Tighten locknuts (24) to 260 lb-ft (353 N
m).
b. Installation
a. Removal


Back to Top