4-26
TB 9-2510-251-13
INITIAL SETUP
Equipment Conditions:
Materials/Parts:
Engine Shut Down (TM 9-2320-280-10)
Tag, Marker (Item 11, Appendix D)
Air Conditioning System Discharged (para 4-14)
Batteries Disconnected (TM 9-2320-280-10)
Personnel Required:
Disconnect Wiring
(1) MOS 52C - Utilities Equipment Repairer
Remove Refrigerant Hoses
Tools and Test Equipment:
General Mechanic’s Tool Kit (Item 1, Appendix B)
Refrigeration Tool Kit (Item 4, Appendix B)
4-15
Air Conditioning Unit Repair
This task covers:
a. Access Panel Removal
b. Distribution Plenum and Centrifugal Fan Repair
c.
Evaporator Coil Replacement
d. Filter Element Replacement
e. Access Cover Repair
f.
Follow-On-Maintenance
General
When the air conditioning system must undergo initial service or maintenance that requires opening
the system, the system must be discharged prior to maintenance and purged and charged after
maintenance.