TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 280 of 704

TB 9-3950-253-13&P
0028-2
0028
REMOVAL
00028
WARNING
During these procedures, personnel are required to work outside the vehicle where there
are several projecting parts, and personnel are required to bend down. Take care when
bending and straightening. A hard hat is required. Failure to follow this warning may result
in injury to personnel.
NOTE
Perform steps 1 through 6 for both right and left sides.
Note position of collars on lifting pin to aid in installation.
1. Raise air transport lifting pin
(Figure 1, Item 7) until collar (Figure 1, Item 2) and spring pin (Figure 1, Item 3)
are accessible through cutout (Figure 1, Item 9).
2. Remove spring pin (Figure 1, Item 3) and collar (Figure 1, Item 2) from air transport lifing pin (Figure 1, Item 7).
3. Remove
air transport lifting pin
(Figure 1, Item 7) from stowage assembly (Figure 1, Item 1).
4. Remove spring pin (Figure 1, Item 4) and collar (Figure 1, Item 8) from air transport lifting pin (Figure 1, Item 7).
5. Remove two knobs (Figure 1, Item 5) from handle (Figure 1, Item 6).
6. Remove handle (Figure 1, Item 6) from
air transport lifting pin
(Figure 1, Item 7).


Back to Top