TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 293 of 704

0029-11
Change 1
TB 9-3950-253-13&P
0029
REMOVAL – CONTINUED
Stowage Guide Sensor Harness Removal – Continued
00029
4. Underneath stowage assembly (Figure 10, Item 1), remove and discard tiedown straps (Figure 10, Item 5) as
required.
5. Remove 13 nuts (Figure 10, Item 2), bolts (Figure 10, Item 3), and clamps (Figure 10, Item 4) from stowage
assembly (Figure 10, Item 1).
Figure 10.
Clamp and Tiedown Strap Removal.
0029
1
2,3,4
5


Back to Top