TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 305 of 704

0029-23
Change 1
TB 9-3950-253-13&P
0029
INSTALLATION – CONTINUED
Stowage Guide Sensor Harness Installation
00029
1. Install 13 clamps (Figure 19, Item 4), bolts (Figure 19, Item 3), and nuts (Figure 19, Item 2) on stowage
assembly (Figure 19, Item 1).
2. Underneath stowage assembly (Figure 19, Item 1), install new tiedown straps (Figure 19, Item 5) as necessary
to secure wiring harnesses to stowage assembly.
Figure 19.
Clamp and Tiedown Strap Installation.
0029
1
2,3,4
5


Back to Top