TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 328 of 704

TB 9-3950-253-13&P
0032-2
0032
REMOVAL
00032
NOTE
Perform steps 1 through 7 for both right and left sides.
1. Remove three grease fittings (Figure 1, Item 3) from roller pin (Figure 1, Item 2).
2. Remove nut (Figure 1, Item 5), washer (Figure 1, Item 4), and roller (Figure 1, Item 1) from roller pin (Figure 1,
Item 2).
Figure 1.
Roller and Grease Fittings.
032
3. Remove locknut (Figure 2, Item 16), washer (Figure 2, Item 17), chains (Figure 2, Items 4 and 15), bolt (Figure
2, Item 3), and washer (Figure 2, Item 2) from lift frame (Figure 2, Item 1). Discard locknut.
4. Remove locknut (Figure 2, Item 14), chain (Figure 2, Item 15), bolt (Figure 2, Item 12), and washer (Figure 2,
Item 13), from pin (Figure 2, Item 11). Discard locknut.
5.
Remove bolt (Figure 2, Item 6), washer (Figure 2, Item 7), two spacers (Figure 2, Item 8), and pivot pin (Figure 2,
Item 10) from lift frame (Figure 2, Item 1).
6. Remove snap ring pin (Figure 2, Item 5), from pin (Figure 2, Item 11).
7. Remove pin (Figure 2, Item 11) and roller pin (Figure 2, Item 9) from lift frame (Figure 2, Item 1).
1
2
3
4
5
3


Back to Top