0020 00
TM 1-4940-355-12&P
WARNING
Six people are required to lift and move Main Box Assembly.
Empty Main Box of
all contents.
NOTE
A forklift with at least 40-inch tines may also be used to lift Main Box Assembly.
3.
Using lifting handles, pick up and place main box in HMMWV cargo bed.
(Figure 2).