TM-1-4940-355-12-P

SHOP EQUIPMENT CONTACT MAINTENANCE (SECM) P/N 50154-001, MOUNTED ON HIGH MOBILITY MULTI PURPOSE WHEELED VEHICLE (HMMWV) HEAVY (HVY) MODEL M1097A2

TECHNICAL MANUAL; OPERATOR’S AND UNIT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

SEPTEMBER 2003

  TM-1-4940-355-12-P - Page 83 of 164

TM 1-4940-355-12&P
0020 00
OUTSIDE OF
MAIN BOX
MS023091
11
9
10
16
15
14
14
13
12
13
12
1
2
3
4
5
6
7
1
2
3
5
6
7
4
8
9
9
Figure 7.
Overhead Cargo/Maintenance Rack Assembly Installation
NOTE
Apply Loctite sealing compound to all bolts during installation and apply RTV
waterproofing compound around all bolt holes on Main Box Assembly.
11. Install two 3/8-inch bolts with lock washers and flat washers (5, 6, 7), in sequence, through Overhead Rack
Assembly and Angle Support into existing tapped holes in Main Box Assembly.
Do not tighten.
(Figure 7)
12. Install two 3/8-inch bolts with lock washers, flat washers and nuts (4, 3, 2, 1), in sequence, through Angle
Support and Overhead Rack Assembly.
Do not tighten.
(Figure 7)
0020 00-7
Change 1


Back to Top