TM-10-4930-247-13-P

HEMTT TANKER AIRCRAFT REFUELING SYSTEM MODEL HTARS100

TECHNICAL MANUAL; OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

FEBRUARY 1994

  TM-10-4930-247-13-P - Page 58 of 309

TM 10-4930-247-13&P
2-.10.
ASSEMBLY AND PREPARATION FOR USE - cont.
Figure 2-12.
Ground Rod Installation.
2-11.
INITIAL ADJUSTMENT.
a.
Hoses, Couplings and Nozzles.
(1)
Verify that all connections are secure.
(2)
Verify that valved dry break couplings are positioned with control arms facing up.
(3)
Verify that caps and plugs are installed on all open components.
(4)
Inspect fuel hoses for kinks, twists and tight bends.
Straighten hoses as required.
b.
CCR Nozzles.
Perform initial adjustments in accordance with TM10-4930-248-13&P.
c.
HEMTT Tanker.
Perform initial adjustments in accordance with TM9-2320-279-10-1.
2-32


Back to Top