TM-10-4930-247-13-P

HEMTT TANKER AIRCRAFT REFUELING SYSTEM MODEL HTARS100

TECHNICAL MANUAL; OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

FEBRUARY 1994

  TM-10-4930-247-13-P - Page 62 of 309

TM 10-4930-247-13&P
2-12.
OPERATING PROCEDURES - cont.
(8)
To take fuel sample, place end or tube (9) in sample container.
(9)
Slowly move control handle (1) on ball valve (2) to open position.
(10)
When sampling is complete, set control handle (1l on ball valve (2) to close position.
Recirculation Nozzle Disconnection.
Refer to figure 2-14.
(11)
Set CCR Nozzle (8) to CLOSE.
Refer to TM10-4930-248-13&P.
CAUTION
If control lever is not in the full CLOSED position (against mechanical stop),
internal fuel pressure may force the poppet into the OPEN position.
(12)
Rotate control lever (7) to full CLOSE position (against the internal mechanical stops).
(13)
Grasp handles (5) and rotate nozzle body (4) to the left until nozzle body disconnects from tanker adapter
(6).
(14)
Install dust cover (3) on end of nozzle body (4).
Figure 2-14.
Single Point Refueling Nozzle (D1) Operation.
2-36
Change 5


Back to Top