TM-10-5411-205-13

SHELTER, ELECTRICAL EQUIPMENT - 250/G

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL

MAY 1995
CHANGE 2

  TM-10-5411-205-13 - Page 43 of 127

TM 10-5411-205-13
3-13.
Bail Handle.
This task covers:
Replace
INITIAL SETUP
Tools
Materials/Parts
General Mechanic’s Automotive Tool Kit
Sealer (Item 28,
Rivets, Various
Appendix D)
Replace.
(1)
(2)
(3)
(4)
(5)
(Figure 3-14)
Drill out five rivets (1). (Refer to paragraph 3-9.a for rivet removal instruc-
tions.)
Take bail handle (2) off shelter roof.
Position bail handle (2) on shelter roof.
Fasten with five rivets (1). (Refer to paragraph 3-9.a for rivet installation
instructions.)
Apply a bead of sealer around edge of bail handle (2) and coat heads of rivets
with sealer.
Figure 3-14. Bail Handle Replacement.
3-26


Back to Top