TM-10-5411-233-13-P

CARGO BED COVER (CBC), TYPE III, 2 1/2 T CARGO TRUCK, LMTV, AND LMTV TRAILER

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS

SEPTEMBER 2002

  TM-10-5411-233-13-P - Page 173 of 356

TM 10-5411-233-13&P
CARGO BED COVER (CBC), TYPE III, 2 1/2 T CARGO TRUCK, LMTV, AND LMTV TRAILER
0017 00
UNIT MAINTENANCE
0017 00-3/(4 Blank)
Dry.
After the rinsing has been finished, allow the work to air dry. Drying can be speeded by wiping with
clean, dry rags. Clean, dry, compressed air should be used to blow moisture from joints, depressions,
etc., and to speed the drying. When the surface is entirely dry, the part is ready for service without further
treatment, or if desired, it may be painted in accordance with manufacturer’s directions.
Refinish in accordance with WP 0039.
2
3
1
4
END OF WORK PACKAGE


Back to Top