TM-5-2330-378-14-P

SEMITRAILER, LOWBED: 40 TON CONSTRUCTION EQUIPMENT TRANSPORTER M870 AND M870A1

TECHNICAL MANUAL; OPERATOR'S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1999

  TM-5-2330-378-14-P - Page 274 of 524

TIVI5-2330-378-14&P
5-4.
MIDDLE AXLE REPLACEMENT (M870A1) (continued).
17.
Using hydraulic jack, lift axle (6) off of two spring assemblies (7).
18.
Remove hubs and brakedrums (para 4-69).
19.
Remove brakeshoes (para 4-46).
20.
Remove camshafts (pare 5-13).
b.
INSTALLATION
1.
Install camshafts (para 5-13).
2.
Install brakeshoes (para 4-46).
3.
Install hubs and brakedrums (para 4-69).
NOTE
Before installing axle on spring assemblies, putspring ends on blocking high enough
to allow dolly jack to roll under spring assemblies
and axle.
4.
Using dolly jack, place axle (6) on two spring assemblies (7).
5.
Install bottom plate (14) on axle (6) and two spring assemblies (7). Lubricate threads on two U-bolts (13),
and secure bottom plate (14) with two U-bolts (13) and four washers (12) and nuts (11). Repeat for other spring
assembly (7). Torque nuts between 275 and 300 ft-lb (373 and 407 N-m).
6
0
1
7
12
12
5-12


Back to Top