TM5-2330-378-14&P
5-3.
MIDDLEAXLE REPLACEMENT(M 70) (continued).
b.
INSTALLATION
NOTE
Beforestartinginstallationprocedure,put springendson blockinghighenoughto
allow dolly jack to roll under spring assembly and axle assembly.
1 .
Put axle ring (18) on axle (6) and line up screw hole.
2.
Install screw (17) in axle ring (18) and axle (6).
3.
Using hydraulic hand jack, put axle (6) on two spring assemblies (7). Be sure alignment pins on axle (6) go
into alignment holes in spring assemblies (7).
4.
Put two U-bolts (115)and spring clamp plate (16) on axle (6) and have assistant hold in place.
5.
Install four nuts (13) and washers (14) on two U-bolts (15) and spring clamp plate (16).
6.
Repeat steps 4 and 5 for other end of axle (6).
WARNING
Keep fingers from between equalizing beam ends and spring ends while balancing
axle as it is moved and lifted into place. Failure to do so could result in injury to
personnel.
7.
While two assistants balance axle (6) and two spring assemblies (7), liftthem from blocking using dollyjack.
Be sure dolly jack is parallel to axle (6) and lifting pad is at the balance point.