TM-5-2330-378-14-P

SEMITRAILER, LOWBED: 40 TON CONSTRUCTION EQUIPMENT TRANSPORTER M870 AND M870A1

TECHNICAL MANUAL; OPERATOR'S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1999

  TM-5-2330-378-14-P - Page 287 of 524

TM 5-2330-378-14&P
5-7.
EQUALIZING
BEAM REPLACEMENT (M870) (continued).
@1
5
14,
12
16
4
10
11
11.
Using hydraulicjack, remove trestle from under spring clamp plate (7) at middleaxle (6).
12.
Using hydraulic jack, remove trestle from under rear corner of semitrailer (5).
13.
Lubricate threads of screw (1) and install nut (3), spacer (2), and screw (1) on equalizing beam (4). Torque
nut to approximately 75 ft-lb (102
N-m).
6
4
3
5
GL
(D
7
1
FOLLOW-ON TASKS:
2
Unchock wheels (para 2-8)
5-25


Back to Top