INSTALLATION - Continued
3.
Coat two outer pivot pins (Figure 6, Item 2) with grease and install dozer blade (Figure 6, Item 3) on apron
(Figure 6, Item 1) with outer pivot pins (Figure 6, Item 2).
4.
Remove lifting device and chain.
3
M0049HBF
1
2
Figure 6.
Dozer Blade Installation.
5.
Move ejector (Figure 7, Item 2) forward, and connect chain (Figure 7, Item 1) between shackle
(Figure 7, Item 4) and eye (Figure 7, Item 3) on ejector (Figure 7, Item 2).
4
M0050HBF
1
2
3
Figure 7.
Chain Connection.
TM 5-2350-377-13&P
0037
0037-5