ASSEMBLY
CAUTION
•
Assembly should be performed in a clean environment and protective dust covers or caps
should be installed on all openings to prevent contamination. Dirt can damage parts and
cause malfunctions.
•
When securing forward left manifold in vise, exercise extreme care not to mar any
surfaces or damage components.
•
Do not over torque.
1.
Install new O-ring (Figure 3, Item 5), transducer T10 (Figure 3, Item 6), two new O-rings (Figure 3, Item 9),
two new packing retainers (Figure 3, Item 7), two new O-rings (Figure 3, Item 8), two new packing retainers
(Figure 3, Item 7), and two two-way (NO) valves V3 and V9 (Figure 3, Item 10) into left forward manifold
(Figure 3, Item 14).
2.
Install new O-ring (Figure 3, Item 2), adapter (Figure 3, Item 1), new O-ring (Figure 3, Item 13), adapter
(Figure 3, Item 16), new O-ring (Figure 3, Item 13), adapter (Figure 3, Item 15), new O-ring (Figure 3, Item 2),
adapter (Figure 3, Item 11), two new O-rings (Figure 3, Item 13), two adapters (Figure 3, Item 12), two new
O-rings (Figure 3, Item 4), and two adapters (Figure 3, Item 3) into left forward manifold (Figure 3, Item 14).
7
8
7
9
7
8
7
9
11
10
2
12
13
12
13
14
13
15
13
16
2
3
4
3
4
5
6
1
M0026HDC
Figure 3.
Hydraulic Diagnostic Center (HDC) Forward Left Manifold Assembly.
END OF TASK
TM 5-2350-378-23&P
0036
0036-5