ASSEMBLY
CAUTION
•
Assembly should be performed in a clean environment and protective dust covers or caps
should be installed on all openings to prevent contamination. Dirt can damage parts and
cause malfunctions.
•
When securing forward right manifold in vise, exercise extreme care not to mar any
surfaces or damage components.
•
Do not over torque.
1.
Install new O-ring (Figure 3, Item 2), transducer T11 (Figure 3, Item 1), two new O-rings (Figure 3, Item 13),
two new packing retainers (Figure 3, Item 14), two new O-rings (Figure 3, Item 15), two new packing retainers
(Figure 3, Item 14), and two two-way (NO) valves V2 and V10 (Figure 3, Item 12) into right forward manifold
(Figure 3, Item 9).
2.
Install new O-ring (Figure 3, Item 4), adapter (Figure 3, Item 5), new O-ring (Figure 3, Item 7), adapter
(Figure 3, Item 6), new O-ring (Figure 3, Item 7), adapter (Figure 3, Item 8), new O-ring (Figure 3, Item 4),
adapter (Figure 3, Item 11), two new O-rings (Figure 3, Item 7), two adapters (Figure 3, Item 10), two new
O-rings (Figure 3, Item 2), and two adapters (Figure 3, Item 3) into right forward manifold (Figure 3, Item 9).
4
5
6
7
7
8
9
7
10
4
11
7
10
14
15
14
13
14
15
14
13
12
1
2
2
2
3
M0030HDC
Figure 3.
Hydraulic Diagnostic Center (HDC) Forward Right Manifold Assembly.
END OF TASK
TM 5-2350-378-23&P
0037
0037-5