TM-5-3805-264-13-P

TRUCK, DUMP, HEAVY, BODY M917A1 AND M917A2

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2014

  TM-5-3805-264-13-P - Page 186 of 660

INSTALLATION
1.
Connect four wiring harness leads (Figure 3, Item 4) to toggle switches (Figure 3, Item 2).
2.
Connect wiring harness connector (Figure 3, Item 6) to indicator light connector (Figure 3, Item 5).
3.
Install MCS control unit (Figure 3, Item 3) on shift tower (Figure 3, Item 1) with four washers
(Figure 3, Item 8) and screws (Figure 3, Item 7).
Figure 3.
MCS Control Unit Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect batteries (TM 9-2320-363-20-1, TM 9-2320-363-20-2).
2.
Turn master battery switch ON (TM 9-2320-302-10).
END OF TASK
END OF WORK PACKAGE
TM 5-3805-264-13&P
0024
0024-4


Back to Top