TM 5-3895-372-20
ADMIX SYSTEMS.
6-10.
FLOWMETERS MAINTENANCE (Continued).
LOCATION/ITEM
ACTION
REMARKS
B.
INSTALLATION (Continued).
19. Four spacers (3).
Install.
20. Four bolts (5), nuts
Install and tighten.
(6) and lockwashers
(4).
21. Two swivel nuts (1).
Install and tighten.
Outlet hoses.
22. Two swivel nuts (2).
Install and tighten.
Inlet hoses.
C.
OPERATIONAL CHECK.
23. Mixer body.
Start up (see TM 9-2320-273-
10 and TM 5-3895-372-10).
24. Air shut-off valve.
Open.
25. Air pressure regulator.
Set to exactly 15 psi (103
kPa).
NOTE
The PTO should be disengaged during the following check.
The two flowmeters are identical.
Use the
following procedure to check either of them.
26. Air and solution
Open on system being checked.
See TM 5-3895-372-10.
gate valves.
27. Flowmeter (23).
Set to exactly 5.8 quarts per minute.
28. Container.
Position to catch all liquid from nozzles.
29. Main clutch lever.
a.
Pull towards rear to open valve.
Start the stopwatch at the same time.
b.
Push forward after exactly one minute. Stop stopwatch.
6-26