TM 5-3895-372-20
ADMIX SYSTEMS.
6-19. DRY ADMIX BIN MAINTENANCE (Continued).
LOCATION/ITEM
ACTION
REMARKS
F.
TEST (Continued).
95.
Cement meter register.
Use count as shown in TM
Multiply this count by 4.
53895372-10 to deliver
1 bag of cement.
96.
Container with material.
Weigh.
Deduct the weight of the
container to obtain material
weight only.
97.
Material weight.
Divide by 4.
This is then the amount of
material being delivered for
each bag of cement used.
NOTE
Do this at various settings on the indicator dial as required by the amount of material to be
used in the mix.
EXAMPLE:
The metering wheel on the mixer is 66.
Four (4) times 66 equals 264 count on the meter.
Discharge this amount in
the container at the exactorate dial setting selected,
weigh container and material,
deduct the weight of the
container and divide by 4.
This will give you the amount of material per bag of cement.
Repeat at various settings
as often as required to determine amounts to be discharged per bag of cement.
The exactorate system may also be calibrated by using the time required to discharge one (1) bag of cement.
The
time will be shown in front of the manual.
This method is not as accurate as the 4 bag method previously described.
6-96