TM-5-3895-372-20

CONCRETE-MOBILE MIXER BODY M919, MODEL 8CM-24/F

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL

AUGUST 1980

  TM-5-3895-372-20 - Page 346 of 694

TM 5-3895-372-20
AGGREGATE SUPPLY SYSTEM.
7-14. CONVEYOR BELT REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
D. REMOVAL OF BROKEN BELT (Continued).
60.
Two winch line
a.Remove pins holding
pulleys (21).
pulleys in place.
b.Mount pulleys with two
Use four washers each for
bolts (23), nuts (24), and
spacers between pulleys and
twelve washers (22) to
frame.
the lower rear frame holes.
61.
Conveyor belt (20).
Let the end of the belt down
over the winch line pulleys (21).
62.
Two ropes (19) and
a.Attach to upper and lower
four wires (18).
half of chain links.
b.Attach other end of ropes
(19) to towing vehicle (27).
c.Pull both halves of conveyor
First pull one half out, then
belt (20) from mixer body.
attach ropes and wires to
other half.
63.
Two locknuts (13).
Loosen.
64.
Two belt tensioning
Loosen bolts (12) approximately
Lubricate bolts and bearing
devices (14).
1-1/2 in. (38 mm).
slides for easy operation.
CAUTION
Do not turn bolts (12) farther than 1-1/2 in. (38 mm) or the sprockets will catch in the cross angles.
65.
Conveyor belt (20).
Install. (Refer to procedure B.)
7-54


Back to Top