TM 5-3895-372-20
Table 8-1.
Cement System Troubleshooting Procedures (Continued)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
2.
CEMENT DELIVERY UNEVEN (Continued):
e.
Readjust spring tines (para 8-12).
Step 5
Check spring tines for:
a.
Bends.
b.
Breaks.
c.
Missing tines.
d.
Missing hammers.
e.
Proper tension (para 8-12).
Replace tines or hammers, adjust tension.
Step 6.
Make sure cross-auger fingers are straight and in place.
Inspect and replace auger fingers (para 9-8).
Step 7.
Check that meter-register cable turns.
Tighten setscrews in cable ends (para 8-13).
Step 8.
Check meter-register cable for loose play.
Adjust or replace cable (para 8-13).
Step 9.
Check that ground straps are in good condition and touch ground.
Properly position or replace straps.
8-8