TM 5-3895-372-20
8-8.
CEMENT SYSTEM MAINTENANCE TASK SUMMARY (Continued).
LIST OF TASKS
TASK
TASK
TASK
TROUBLESHOOTING
NO.
REF
REF (TABLE)
3.
Filter Cloth Replacement:
8-11
8-1
a.
Operational check.
8- 11A
b.
Removal.
8-11 B
c.
Installation.
8-11C
4.
Spring Tine Maintenance:
8-12
8-1
a.
Inspection.
8-12A
b.
Hammer replacement.
8-12B
c.
Adjustment.
8-12C
5.
Meter Register Cable Maintenance:
8-13
8-1
a.
Removal.
8-13A
b.
Lubrication.
8-13B
c.
Installation.
8-13C
d.
Operational check.
8-13D
NOTE
Maintenance procedures for the
fluffer air supply and bin vibrators are
listed in paragraphs 11-8, 11-12, and
11-14.
6.
Cement Meter Register Replacement:
8-14
8-1
a.
Removal.
8-14A
b.
Installation.
8-14B
7.
Cement System Drive Maintenance:
8-15
8-1
a.
Removal.
8-15A
b.
Disassembly.
8-15B
c.
Cleaning and inspection.
8-15C
d.
Assembly.
8-15D
e.
Installation.
8-15E
8-19