TM 5-3895-372-20
CEMENT SYSTEM.
8-10.
SCREEN VIBRATOR MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a.
Removal.
( 5)
b.
Installation.
( 5)
c.
Operational Check.
( 5)
15 Minutes Total
INITIAL SETUP
EQUIPMENT
CONDITION
PARAGRAPH
CONDITION DESCRIPTION
None.
None.
.
APPLICABLE CONFIGURATIONS
M919.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Oil (See Appendix C).
PERSONNEL REQUIRED
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
One (MOS-62B20).
REFERENCES (TM)
GENERAL SAFETY INSTRUCTIONS
LO 53895-372-12.
Engine Off.
TM 5-3895-372-10.
Transmission in Neutral.
TM 5-3895372-2P.
Parking Brake Set.
TM 923285-273-10P.
Safety Glasses Should be Worn When Working
Around Cement.
TROUBLESHOOTING REFERENCES
Table 61.
8-24