TM 5-3895372-20
POWER TRAIN.
4-12. MAIN SHAFT MAINTENANCE (Continued).
LOCATION/ITEM ACTION REMARKS
F.
CHECKING ALINEMENT.
NOTE
Check the alinement of both sheaves as shown in illustration. If alinement is correct, this
procedure is completed. If it is necessary to re-aline the sheaves, follow steps below and
re-check alinement.
45.
V-belts.
Remove as needed.
Refer to paragraph 4-16 or
4-17.
46.
Hex bolts (5) and
Remove.
washers (7) or hex
bolts (17) and
washers (18).
47.
Sheave (10) or (20).
Remove.
48.
Bushing (11) or (19).
Tap with soft headed
hammer to aline.
49.
Sheave (10) or (20).
Install.
50.
Three hex bolts (5) and
Install and tighten.
washers (7) or hex bolts
(17) and washers (18).
51.
V-belts.
Install
Refer to paragraph 4-16 or
4-17.
52.
Re-check alinement.
4-40