POWER TRAIN.
4-13. PTO BELTS SHAFT ASSEMBLIES MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a
Disassembly.
(30)
b.
Cleaning and Inspection.
(20)
c.
Assembly.
(30)
Minutes Total.
INITIAL SETUP
EQUIPMENT
CONDITION
PARAGRAPH
CONDITION DESCRIPTION
4-12A.
Shaft Assemblies Removed.
APPLICABLE CONFIGURATIONS
(as Needed).
M919.
4-16A & 4-17A.
Belts Loosened.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
SD-2 Dry Cleaning Solvent (Refer to Appendix C).
PERSONNEL REQUIRED
SPECIAL ENVIRONMENTAL CONDITIONS
Two (MOS-62B20).
Vehicle Parked on Level Ground.
REFERENCES (TM)
GENERAL SAFETY INSTRUCTIONS
LO 5-3895372-12.
Engine Off.
TM 9-2320-273-10.
Transmission in Neutral.
Parking Brake Set.
TROUBLESHOOTING REFERENCES
Table 4-1.
4-42