PERFORM PROCEDURE - Continued
7
8
6
2
Figure 4.
Valve Plunger Tool.
a.
When the procedure directs the operation of the remote control unit or the cab controls, use the manual
valve plunger tool (Figure 4, Item 6), follow procedures on the instructional placard (Figure 4, Item 2),
and perform the operation within the control valve layout of the hydraulic manifold assembly.
b.
Fit plunger tool (Figure 4, Item 6) in appropriate hole in hydraulic manifold assembly (Figure 4, Item 7)
and press plunger tool (Figure 4, Item 6) into solenoid button (Figure 4, Item 8).
END OF TASK