TM-5-3990-263-13-P

PALLET, ADAPTER, BRIDGE, M15

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

APRIL 2012

  TM-5-3990-263-13-P - Page 494 of 728

INSTALLATION - Continued
13
13
15
9
12
11
16
14
17
Figure 6.
Rear Carriage Installation.
8.
Install two fittings (Figure 6, Item 16) on manifold (Figure 6, Item 17). Install two hydraulic hoses (Figure 6,
Item 14) and elbows (Figure 6, Item 15) on two hydraulic cylinders (Figure 6, Item 13).
9.
Align track (Figure 7, Item 10) in BAP frame (Figure 7, Item 7) with tabs on rear carriage (Figure 7, Item 9),
and install center roller assembly (Figure 7, Item 8) on frame (Figure 7, Item 7).
7
8
4
9 10
10
9
5
6
Figure 7.
Center Roller Hydraulic System Installation.
TM 5-3990-263-13&P
0060
0060-6


Back to Top