TM 5-4210-249-13&P-2
0224-3/(4 blank)
DRAFT
0224
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Install hose (4) on charge air cooler (5) and intake tubing (6) with two clamps (3).
5.
Install ducting (2) on charge air ducts with two clamps (1).
NOTE
•
Use the suggested tension setting for initial tensioning.
When belt is installed, run water
pump engine under load for 15 minutes, shut down and readjust belt tension.
•
Belt tension has a range of +/- 11 lb-ft (49 N).
6.
Start water pump engine and run under load for 15 minutes.
7.
Shut down engine and readjust alternator drive belt (12) tension to 67 lb-ft (298 N), as indicated by belt
tensioner gauge.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install passenger side crew cab access panel (WP 0499)
2.
Install pump house panel O (WP 0540)
END OF TASK
END OF WORK PACKAGE
TFFT00903A