TM 5-4210-249-13&P-2
0225-1
DRAFT
0225
FIELD LEVEL MAINTENANCE
WATER PUMP ENGINE BATTERY CABLES REPLACEMENT
INITIAL SETUP:
REMOVAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
•
Tag and mark cables prior to removal to ensure proper installation.
•
Remove cable ties as required.
1.
Remove nut (1), lockwasher (2), and negative battery cable (3) from starter solenoid stud (4).
Discard
lockwasher.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT00886
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Sealant, RTV 200 Electrical (WP 0625, Item 47)
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
Lockwasher (5)
References
WP 0615, Fig. 25
Equipment Conditions
Pump house panels H, I and U
removed (WP 0540)
Pump house heater electric connectors
disconnected (WP 0209)
Pump house heater hose removed (WP 0209)
Starter motor access panel removed (WP 0248)