TM-5-4210-249-13-P-2

TACTICAL FIRE FIGHTING TRUCK (TFF) MODEL M1142

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST (INCLUDING DEPOT REPAIR PARTS AND SPECIAL TOOLS); PART 2 OF 4

  TM-5-4210-249-13-P-2 - Page 1110 of 1452

TM 5-4210-249-13&P-2
0225-4
DRAFT
0225
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
7.
Install negative battery cable (3) on starter solenoid stud (4) with lockwasher (2) and nut (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install starter motor access panel (WP 0248)
2.
Install pump house heater hose (WP 0209)
3.
Connect pump house heater electric connectors (WP 0209)
4.
Install pump house panels U, I, and H (WP 0540)
END OF TASK
END OF WORK PACKAGE
TFFT00886


Back to Top