TM 5-4210-249-13&P-2
0191-4
DRAFT
0191
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
18. Install cover (2) on foam level gauge (3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator’s panel cover (WP 0019)
2.
Install foam tank level probe (WP 0281)
END OF TASK
END OF WORK PACKAGE
TFFT02815