TM 5-4210-249-13&P-3
0417-1
DRAFT
0417
FIELD LEVEL MAINTENANCE
PUMP OPERATOR’S PANEL ELECTRIC VALVE CONTROL/METER REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
•
All electric valve control/meters are replaced the same way.
Passenger side 1.5 in.
pre-connect electric valve control/meter shown.
•
Tag and mark wires prior to removal to ensure proper installation.
1.
Disconnect four connectors (1).
2.
Remove four screws (2), washers (3), and electric valve control/meter (4) from pump panel (5).
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT00056
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Tags, Identification (WP 0625, Item 51)
References
WP 0615, Fig. 56
Equipment Conditions
Batteries disconnected (TM 9-2320-325-14&P)
Pump panel housing opened (WP 0325)