TM 5-4210-249-13&P-3
0457-1
DRAFT
0457
FIELD LEVEL MAINTENANCE
PUMP HOUSE POWER DISTRIBUTION WIRE HARNESS AND BLOCK REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
•
Tag and mark wires prior to removal to ensure proper installation.
•
Remove cable ties as required.
1.
Remove nut (1), lockwasher (2), and wire 1640 (3) from pass-through terminal block (4).
Discard lockwasher.
2.
Remove nut (5), lockwasher (6), and five wires 1138 (7) from pass-through terminal block (8).
Discard
lockwasher.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT03055
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Adhesive, Sealant, Silicone RTV
(WP 0625, Item 5)
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
Materials/Parts (continued)
Lockwasher (2)
Lockwasher (2)
References
WP 0615, Fig. 94
Equipment Conditions
Pump house panel S removed (WP 0540)