TM 5-4210-249-13&P-3
0457-4
DRAFT
0457
INSTALLATION
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
•
Install circuit breakers and relays in same position as noted prior to removal.
•
Install cable ties as required.
1.
Install nine relays (24) and 16 circuit breakers (23) on pump house power distribution block (22).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2.
Install pump house power distribution wire harness block (22) on plate (19) with two washers (21) and
screws (20).
3.
Install plate (19) on pump house power distribution box (15) with four screws (18).
TFFT03059
TFFT03058