TM 5-4210-249-13&P-3
0457-6
DRAFT
0457
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
8.
Connect pump house wire harness connector (11) on pump house power distribution wire harness connector
DP1 (12).
9.
Connect pump house wire harness connector (9) on pump house power distribution wire harness connector
DP2 (10).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10. Install five wires 1138 (7) on pass-through terminal block (8) with lockwasher (6) and nut (5).
11. Install wire 1640 (3) on pass-through terminal block (4) with lockwasher (2) and nut (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install pump house panel S (WP 0540)
END OF TASK
END OF WORK PACKAGE
TFFT03056
TFFT03055