TM 5-4210-249-13&P-4
0584-2
DRAFT
0584
INSTALLATION
1.
Apply lubricating oil to three preformed packings and install elbow (2) and three preformed packings (4) on
hydraulic generator compensator (5).
2.
Install hydraulic generator compensator (5) on PTO pump (6) with four screws (3).
3.
Install hose (1) on elbow (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Fill hydraulic reservoir (WP 0588)
2.
Adjust hydraulic generator compensator (WP 0192)
3.
Install pump house panel G (WP 0540)
END OF TASK
END OF WORK PACKAGE
TFFT00608