TM-5-4210-249-13-P-4

TACTICAL FIRE FIGHTING TRUCK (TFF) MODEL M1142

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST (INCLUDING DEPOT REPAIR PARTS AND SPECIAL TOOLS); PART 4 OF 4

FEBRUARY 2009

  TM-5-4210-249-13-P-4 - Page 274 of 1012

TM 5-4210-249-13&P-4
0606-12
DRAFT
0606
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Perform Steps (31) through (54) to install heat trace cable to terminal in junction box.
Allow approximately 24 in. (610 mm) of heat trace cable for installation in junction box.
32. Cut off end of heat trace cable (10) at 45 degrees.
33. Push 12 to 18 in. (30 to 457 mm) of heat trace cable (10) through bottom of junction box (4).
34. Cut off end of heat trace cable (10) at 90 degrees to square off cable.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT00970


Back to Top