TM 5-5420-202-20-2
BREATHER LINE REPLACEMENT (Sheet 5 of 5)
4.
Install two loop clamps (G) on metal breather tube (H) and one loop clamp (G) on hose (B).
5.
Using 7/16 inch socket, install two loop clamps (G), lockwashers (J), and screws (K).
6. Check all hose connections for tightness.
7. Tighten if necessary.
8.
Install air cleaner intake hoses (page 7-68).
9. Install powerplant (page 5-14).
End of Task
7-157