TM 5-5420-202-20-2
POWERPLANT REPLACEMENT (Sheet 15.1 of 21)
14.
Check that powerplant is correctly
seated. Check all clearances around
powerplant.
15.
Remove four sling chain hooks from
four lifting eyes of powerplant.
16.
Install washer (A), recessed washer
(B), lockwasher (C), and bolt (D) (both
sides).
17.
Using 1-1/2 inch socket and torque wrench,
tighten bolt (D) securing transmission
mounting bracket to 370-375 lb-ft (501-
508 NŽm).
20.
Fit quick-disconnect ring (E) around
final drive adapter.
Go on to Sheet 16
18.
19.
Have second technician hold universal joint
with final drive guide adapter.
Using pinch bar, pry final drive adapter
away from final drive into universal
joint (each side).
Change 3
5-16.1/5-16.2 blank)