TM 5-5420-202-20-2
POWERPLANT REPLACEMENT (Sheet 10 of 21)
37.
38.
39.
Remove two bolts (AK), lockwashers
(AL), recessed washers (AM), and washers
(AN) securing two mounting brackets
to transmission mounts.
Check all disconnected rod and line
ends to make sure they are out of way
during powerplant removal.
Connect hoist hook to sling. Make sure
hoist hook is put through hole for power-
plant.
Go on to Sheet 11
36.
Using 1-1/2 inch socket, loosen two
bolts (AK) at transmission mounts
(both sides).
5-11