TM 5-5420 -202-20-2
TRANSMISSION SHROUDS REPLACEMENT (Sheet 1 of 8)
PROCEDURE INDEX
PROCEDURE
Right intermediate Shroud Replacement
Lower Shroud Replacement
Left Intermediate Shroud Replacement
PAGE
9-22
9-27
9-29
Right Intermediate Shroud Replacement (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
9-22
9-25
TOOLS:
1/2 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
1/2 in, combination box and open end wrench
Spanner wrench
PRELIMINARY PROCEDURE:
Remove powerplant (page 5-2).
Go on to Sheet 2
9-22