TM 5-5420-202-20-2
TRANSMISSION SHROUDS REPLACEMENT (Sheet 5 of 8)
Right Intermediate Shroud Replacement (Sheet 5 of 5)
5.
Install cable
assembly
(E) through intermediate
shroud (A).
6.
Route cable assembly (E)
to generator (F).
7.
Using spanner wrench, connect cable assembly (E) connector to generator (F) connector.
8.
Install grommet (G) around cable assembly (E) and into intermediate shroud (A).
9.
Install powerplant (page 5-14)
End of Task
9-26