TM 5-5420-202-20-3
BASKET/CONTROL PANEL POWER HARNESS REPLACEMENT (Sheet 2 of 4)
2.
Disconnect connector (C) at basket disconnect
(page 10-296.69).
(D), lockwasher (E), and flat washer (F)
securing strap (G) at three locations.
Leave bottom screw (H) installed.
4.
Using 7/16 inch socket, remove screw
(J) and lockwasher (K) securing clamp
(L) at six locations.
5.
Using fingers, slip basket/control panel
power wiring harness (M) from behind straps
(G), out of clamps (L), and remove from
vehicle.
NOTE
The illustration below shows the
location of
harness
assembly
supporting clamps and straps and
the routing of the harness assembly.
Go on to Sheet 3
5-28
10-296.26
Change 7
3.
Using 7/16 inch socket, remove top screw


Back to Top