TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 372 of 1060

TM 5-5420-202-20-3
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 4 of 5)
INSTALLATION:
1.
2.
3.
4.
Place harness assembly (A) in position
behind straps (E) and through clamps
(H) as shown.
Using 7/16 inch socket, install screws
(B), new lockwashers (C), and flat washers
(D) to secure straps (E) at three locations.
Using 7/16 inch socket, install screws (F)
and flat washers (G) to secure clamps (H)
at six locations.
Using 7/16 inch socket, install screws
(J) and new lockwashers (K) to secure
clamps (L) at vehicle floor and at purge
pump handle (M).
Go on to Sheet 5
5-34
10-296.32
Change 7


Back to Top